Posts Tagged ‘Kitchen’

Inspecting

Tuesday, May 19th, 2009

Construction is finally done and we are just waiting for all the inspections to complete. Our sign is not up yet so we’ve put up a temporary sign until the real sign comes. Once we get the inspection, we will start taste testing our food and soon everyone will be able to enjoy some delicious Thai food delivered to you!

IMG_4377
Welcome to Thai2Go!

IMG_4381
Lights in front of the restaurant.
IMG_4382
Lights on the side of the restaurant
IMG_4374
The kitchen ready to make the best Thai food you’ll ever put in your mouth!

Topped and Equipped

Tuesday, April 28th, 2009

Today, our granite countertops are being installed. It makes the counter look a whole lot better. I was also able to get a shot of my GC in the pic. He’s always running around like crazy. If you’re ever looking for a contractor, this is the guy to see. Contact me and I’ll give you his number.

IMG_0432

The vent shaft is also near completion. It looks like a huge robotic tentical from the sky! Take a look and you’ll see what I mean.

IMG_0431
I could probably use it as an escape chute.

Our equipment is also coming in gradually. We did have some issues with the size of one table as all the cooking equipment must be under the hood. We had to get a smaller table to accomodate the lack of space under the hood but everything worked out so far. Check it out and let me know what you guys think.

IMG_0429
This is where the magic happens.

T2G Gets the Greenlight

Thursday, April 16th, 2009

Well we finally receive the approval we need to build our vent shaft which will go up 5 stories high. It’s the drawbacks of opening up a restaurant under an apartment complex. The contractor needed to access the shaft space on every floor which means that he’ll needed to punch a hole through the wall. We had to get permission from the apartment owners first. After weeks of going back and forth and jumping through many hoops we’re good to go! Now it’s full steam ahead and the kitchen should be done in 3 weeks!